InspecIQ

Digital Inspections from First Visit to Final Report

Plan quality control, inspect fire stopping installations with adaptive forms, capture photos against drawing locations, export branded PDFs in one tap, and publish a permanent QR verification portal customers can scan years from now.

How it works
9:41●●●● 5G
KBH Tower Bsyncing
Level 4 · Riser cabinet
B-04-12 · EN 1366-3 · EI 120
11 of 18 answeredAuto-saved 6s ago
Q 12 · Substrate
Substrate confirmed on site?
YesNoN/A
Q 13 · Annular space
Photo of measurement
+
NNordfire
RPT-2026-0418
Inspection Report · Level 4 Riser Cabinet
KBH Tower B · EN 1366-3 · EI 120 · Pass
ProjectKBH Tower B
LocationB-04-12
SubstrateConcrete 200 mm
PenetrantCu Ø35 × 4
SealantCFS-CT B · 25-08-A
ResultEI 120 · PASS
M. Eriksen
Installer · 18/04/2026
A. Holm
Inspector · 18/04/2026
How it works

From quality plan to verified record in three steps

01
Set up

Create the project control plan

Spin up a project, upload the drawing, assign inspection points, and pick the quality control template. Forms adapt to the substrate, penetration, and fire class.

02
Capture

Capture on site with photos, drawings, and answers

Snap photos, drop pins on drawings, scan sealant batch QRs, and answer context-aware questions that reduce missed evidence and user error.

03
Report

Generate the report and QR record

Branded PDFs are ready in one tap, archived to the project, and available through QR access for handover, audit, and facility management.

Public QR verification

Verification that stays with the installation

A QR sticker on every penetration and a permanent branded portal behind it. Building owners, auditors, and facility teams can verify the certificate, photos, install video, inspection result, and inspector signature long after handover.

  • Permanent and branded. Your logo, your colors, and your domain. The customer never lands on a BYLT URL.
  • No login required. Read-only by default so building owners, auditors, facility managers, and fire marshals can scan and verify the proof immediately.
  • Long-term traceability. Certificates, photos, signatures, batch numbers, and location records stay preserved with durable timestamps.
See how it works
9:41●●●● 5G
NNordfire
Riser cabinet · Level 4
KBH Tower B · B-04-12
Certified · EI 120 · Passed
SystemCFS-CT B 200
StandardEN 1366-3
Installed18 / 04 / 2026
InspectorA. Holm
Certificate (PDF)
Installer datasheet
Install video · 4:12
Quality control planning

Start every inspection from the same project control plan

BYLT helps teams define inspection points, evidence requirements, and review expectations before work begins, so fire compliance does not depend on each crew inventing its own process.

  • Standardized inspection workflows for repeatable quality control
  • Project-level requirements for photos, measurements, and signatures
  • Clear progress visibility for project managers and compliance leads
Project control plan
KBH Tower B · Level 4 · 18 inspection points
Certified system selectedComplete
Evidence requirements assignedRequired
Drawing pins placed18 / 18
Manager reviewPending
Smart conditional forms

Ask the right questions for this installation

Inspection forms adapt to the substrate, penetration, fire class, and evidence required for the installation, reducing missed checks and keeping records consistent.

  • Context-aware questions without irrelevant form sections
  • Structured data collection for cleaner inspection documentation
  • Required evidence prompts before the inspector leaves the location
9:41●●●● 5G
KBH Tower Bsyncing
Level 4 · Riser cabinet
B-04-12 · EN 1366-3 · EI 120
11 of 18 answeredAuto-saved 6s ago
Q 12 · Substrate
Substrate confirmed on site?
YesNoN/A
Q 13 · Annular space
Photo of measurement
+
Drawings & pin traceability

Every inspection record stays tied to a real location

Drawings, pins, photos, signatures, and report data stay connected to the installation they document, giving teams and auditors a clear map of what was inspected.

  • Drawing-based inspection points for each penetration
  • Evidence tracked by location, installation, and status
  • Project records that remain understandable after handover
NNordfire
RPT-2026-0418
Inspection Report · Level 4 Riser Cabinet
KBH Tower B · EN 1366-3 · EI 120 · Pass
ProjectKBH Tower B
LocationB-04-12
SubstrateConcrete 200 mm
PenetrantCu Ø35 × 4
SealantCFS-CT B · 25-08-A
ResultEI 120 · PASS
M. Eriksen
Installer · 18/04/2026
A. Holm
Inspector · 18/04/2026
Built for the field

Everything an inspector needs, nothing they don't

No bloated CMMS. No 40-tab forms. Just standardized fire protection inspections, structured evidence capture, and compliance documentation that holds up later.

Smart conditional forms

Adaptive inspection forms branch on substrate, penetration, and fire class so the crew captures structured data without answering irrelevant questions.

if EI≥120→ ask batch+ photo

Drawing-based records

Upload a floor plan, pin penetrations, and link inspections so every record stays anchored to a real location and installation.

B-04 · 12 pins9 done3 left

PDF export

Branded, paginated, signed PDFs in one tap. Auto-archived to the project and ready for audit-ready reports immediately.

12 pagesPDF · 2.1 MBsent

QR verification portal

A permanent URL per penetration on your domain so approved work can be verified by owners, auditors, and facility teams for years.

nordfire.eu/p/...live

Ready to leave paper behind?

Move every inspection into a repeatable quality control workflow your team can trust.